Onshore wind power: investing in a sustainable future with tailor-made solutions.

Build a renewable future

Gecodor: a qualified partner with integrated expertise in the design, development and construction of wind farms in Italy.

Onshore wind energy is one of the most established and reliable solutions for renewable energy production in Italy.

Building an onshore wind farm allows you to invest in infrastructure that generates environmental, economic and social benefits, reducing CO₂ emissions and enhancing the value of the local area.

Gecodor stands out for its integrated approach, which ranges from site identification and feasibility studies for wind farms to the design, construction, management and repowering of existing plants.

In this way, every wind farm in Italy developed with our support meets the highest standards of efficiency and sustainability.

Site identification, at the heart of the value of an onshore wind farm

Each project is supported by a feasibility study for wind farms, which includes technical, economic and regulatory analyses.

Our in-house team of professionals with multidisciplinary expertise in civil, electrical and environmental engineering, regulations and authorisation processes ensures that projects are concrete and ready for construction. They handle:

  • environmental and landscape assessments,
  • impacts on biodiversity, noise and shading,
  • photo insertions and 3D modelling of the plants;
  • managing dialogue with local communities and stakeholders;
  • authorisation procedures in accordance with national and regional regulations.
 

The result is a transparent project that is shared and in line with the needs of the local area and investors.

Feasibility studies and authorisations

Each project is supported by a feasibility study for wind farms, which includes technical, economic and regulatory analyses.

Our in-house team of professionals with multidisciplinary expertise in civil, electrical and environmental engineering, regulations and authorisation processes ensures that projects are concrete and ready for construction. They handle:

  • environmental and landscape assessments,
  • impacts on biodiversity, noise and shading,
  • photo insertions and 3D modelling of the plants;
  • managing dialogue with local communities and stakeholders;
  • authorisation procedures in accordance with national and regional regulations.
 

The result is a transparent project that is shared and in line with the needs of the local area and investors.

Implementation and commissioning

Once studies and authorisations have been completed, we move on to the construction phase. This is where the expertise of our engineering team comes into play, supervising the entire process:

  • engineering feasibility analysis,
  • planning of civil and electrical works,
  • logistics and supplier management,
  • assembly and testing of onshore wind turbines.
 

The constant presence of our Project Managers ensures that the plant is built on schedule, with high safety standards and efficiently connected to the grid.

Wind energy: advantages and considerations before investing

Onshore wind energy is now one of the most reliable and established renewable sources, but like any technology, it has strengths and aspects that need to be carefully considered.

Advantages of Onshore Wind Power

  • Stable production of renewable wind energy, thanks to increasingly efficient turbines.
  • Significant reduction in pollutant emissions and a concrete contribution to decarbonisation.
  • Access to incentives and subsidies provided by policies supporting renewable sources.

Assessments to be made before the project

  • The need to identify suitable sites that are well ventilated and logistically accessible.
  • The landscape and visual impact of onshore wind turbines, which requires careful design.
  • The complexity of the authorisation process, which is often long and complicated.
 

With Gecodor, these issues are addressed in a transparent and professional manner.

We support investors and owners in objectively assessing the pros and cons of wind farms, transforming potential critical issues into opportunities thanks to a model that provides risk sharing and comprehensive technical support at every stage of the project.

Project Management and implementation

The execution phase is led by our Project Managers, who support the client from choosing the best location for the project to the launch of the offshore wind farm.

We handle:

  • planning and control of activities;
  • resource management based on budget and timelines;
  • supervision of suppliers and operational teams;
  • ensuring full compliance with high quality standards at every stage of the project.
 

Our method integrates experience and expertise gained in onshore and offshore wind power, ensuring transparent and reliable management.

Sharing business risk

One of the most innovative aspects of our model is the creation of a special purpose vehicle (SPV) together with the investor.

This means that Gecodor works alongside the entrepreneur during the development phase: from obtaining authorisations to constructing the onshore wind farm in Italy, right up to the start of production.

By acquiring company shares when the project is ready to build, the investor can proceed with the production and sale of renewable energy once the work is complete and the plant is operational.

A clear, secure and advantageous model for those who want to invest in wind energy with a reliable partner who is ready to share the project risk with them!

Put your trust in Gecodor, a team with integrated skills

An onshore wind farm requires the coordination of numerous professionals. Our organisational chart includes all the necessary skills: engineers, environmental technicians, wind farm design experts, design and administrative specialists.

This in-house structure eliminates waste, reduces time and allows total control of the process.

We operate according to a proven working model that takes into account the operation of wind energy (diagrams, simulations, renderings) and current regulations, right down to the management of bureaucratic details such as the wind farm concession fee.

Our experience gained in wind power in Italy and in international projects makes us the ideal partner for developing wind farms in Italy, both onshore and offshore.